Entrances and exits
A lot with two ways in stages easily. One with a single entrance needs more thought, because that entrance cannot be the area curing when customers arrive.
Serving Minneapolis, Minnesota & surrounding areas
Mon–Fri 8am–6pm · Sat 9am–2pm
Sealcoating and striping for Fridley lots, staged so customers and deliveries can still reach the building.
A lot is not just pavement, it is how customers, staff, and deliveries reach a building. The scope has to respect that.
For the light commercial work we do in Fridley, the hard part is rarely the coating. It is agreeing which areas close when, so the entrance stays usable and a delivery vehicle does not end up parked on a surface that was sealed an hour earlier.
That usually means staging. We split the lot into areas, take them in an order that keeps a route to the door open, and work around your hours where the schedule allows it. Early starts and weekend work are both normal on this kind of job.
Striping is part of the same conversation. Coating removes existing markings, so stalls, arrows, and any fire lane markings need to be laid back out afterward. Deciding that before the coating goes down is simpler than discovering it after.
These four things determine how a lot gets staged. We work through them with you on site rather than assuming a standard layout.
A lot with two ways in stages easily. One with a single entrance needs more thought, because that entrance cannot be the area curing when customers arrive.
Loading areas, dumpster access, and service doors all need a route on the day. We would rather know your delivery windows up front than work around a truck that has already arrived.
Pavement where vehicles turn takes more punishment than pavement they drive straight across. Those areas are worth identifying, because they are where a coating is tested first.
Stall counts, directional arrows, accessible spaces, and fire lanes get recorded before coating so they go back correctly. A photographed layout beats someone's memory.
Each stage below finishes before the next begins, which is what keeps a working route open throughout.
We measure, record the existing markings, and set the stage order with you. You leave that conversation knowing which areas are closed on which day.
The area is cleared, swept, and cleaned, with cracks and trouble spots handled first. Oil-stained areas around delivery bays get specific attention, since sealer does not bond well over them.
Sealer goes down at the specified rate and the area stays closed through its cure window. Cones and signage keep it closed, which matters more on a commercial lot than a driveway.
Once the coating has cured, markings go back on: stalls, arrows, and any fire lane or accessible-space markings the lot carried before.
We are based at 2010 E Hennepin Ave, Suite 4, Minneapolis, MN 55413, and Fridley is part of the area we cover from there. There is no separate office or local crew: the same people who do the work in Minneapolis do it here.
Call (763) 294-3020 to talk through the pavement, or request an estimate and we will arrange a time to look at it.
Request an EstimateThis site's published ranges cover light commercial work in Fridley. Striping is quoted separately, since it depends on the marking count.
Light commercial sealcoating generally falls in the $0.20 to $0.50 per square foot band, with small lots commonly landing between roughly $500 and $1,500 or more once layout and condition are accounted for.
On a staged lot, the schedule affects the figure as much as the area does. Splitting work across several visits or into out-of-hours windows takes more time than a single uninterrupted pass, and we will show you both options with their costs when the layout allows a choice.
Property managers and business owners ask these most often. The specifics for your lot come from a site walk.
Usually not. Most lots can be staged so a route to the building stays open, though a lot with a single narrow entrance sometimes needs a closure or an out-of-hours slot. We tell you which yours is before booking.
Coating covers existing markings, so they are restriped afterward. We record the layout before we start, including arrows and any fire lane or accessible-space markings, so it goes back the way it was.
Often, yes, and on busy lots it is the easier answer. Cure time still has to fit the schedule, so an overnight start does not always mean the lot is ready at opening.
Those get specific treatment, because sealer does not bond reliably over oil-saturated asphalt. Where saturation is deep, that area may need repair rather than coating, and we will flag it on site.
Tell us about the pavement, then we can discuss the next practical step. Our office is at 2010 E Hennepin Ave, Suite 4, Minneapolis, MN 55413.
Call Now (763) 294-3020